Project Profile
Kings River Pipeline Project
Location
Fresno, CA
Details
The Kings River Pipeline with be a new 13 mile long, 72-inch diameter, raw water pipeline to convey surface (river) water from the Kings River to a new Southeast Surface Water Treatment Facility (SESWTF). NSB is being placed upto the springline of the pipe. Production depending on weather and obstacles is up to 400 feet per day.Construction Cost Estimate: $53.8 million.