Project Profile

Kings River Pipeline Project

Location

Fresno, CA

Details

The Kings River Pipeline with be a new 13 mile long, 72-inch diameter, raw water pipeline to convey surface (river) water from the Kings River to a new Southeast Surface Water Treatment Facility (SESWTF). NSB is being placed upto the springline of the pipe. Production depending on weather and obstacles is up to 400 feet per day.Construction Cost Estimate: $53.8 million.

Related Projects
Contact Us

Please send us a message and we'll get back to you as soon as possible.

Not readable? Change text. captcha txt

Start typing and press Enter to search

Kaiser Hospital Expansion